| Title | Author |
|---|---|
|
12/28/2011 |
James R. Egnot, PE |
|
Vulnerability-based risk assessment for stream instability at bridges 09/15/2011 |
P. A. Johnson and R. M. Whittington |
|
09/01/2011 |
Dr. Marco Rosignoli, PE |
|
The Ambassador Bridge Gateway public art project case study 01/31/2011 |
Eric R. Polvi, PE |
|
Adapting a roadside media filtration BMP for dissolved metals removal at the end of pipe 01/28/2011 |
Alan Black, PE, HNTB Corporation and others |
|
01/28/2011 |
A. Ekin Senturk and Christopher Higgins |
|
Incremental launching construction of urban bridges 01/28/2011 |
Dr. Marco Rosignoli, PE and Dr. Ing. Chiara Rosignoli |
|
Incremental launching of bridges in Europe 01/28/2011 |
Dr. Marco Rosignoli, PE and Dr. Ing. Chiara Rosignoli |
|
Incremental launching of presstressed-concrete urban bridges 01/28/2011 |
Dr. Marco Rosignoli, PE |
|
Innovative redesign for cost savings on vertical lift bridge 01/28/2011 |
E. Kelly, PE and W. Nickoley, PE |
- 1 of 4
- ››
