Multimedia

Time-lapse of Lake Champlain Bridge span lift


A time-lapse video of the HNTB-designed span lift for the network tied-arch Lake Champlain Bridge. Barges move into place the main span of the bridge and then strand jacks lift the span into place. This approach saves a great deal of time and money opening the bridge to traffic sooner while increasing safety for highway workers.

 

 

Market: 

Point of View

  • "Bridges: Constructability and sustainability - finding ways to maximize infrastructure dollars"
  • Brad Guilmino, Chief Financial Consultant
    By expanding a popular credit assistance program, Congress and the president can encourage infrastructure investment and enhance effectiveness of available federal funding
  • Paul Yarossi, president, HNTB Holdings Ltd
    Time to focus on how transportation investment pays back America